Responsible for Industrialization of the product system and commodity.
• Responsible for installation and maintenance of Glass Encapsulation line
• Responsible for planning of a lean and optimized production concept for all customers
• Preparation of technical concept including invest, cost, MTM planning, Value stream mapping and emergency concept.
• Preparation of optimized layout for assembly line for lean LO concept.
• Preparation of the concept decision documents for concept release.
• Responsible to make the PFMEA and specification for assembly line.
• Ensuring and checking the supplier quotes are according to specification and technical aspects
• Planning and preparation of a sub time plan for machine manufacturer.
• Responsible to carry out the initial discussion with specification, DAP, and technical agreement with release suppliers.
• Managing and assisting the equipment manufacturing according to timeline with machine manufacturer.
• Ensuring all technical aspect fulfilled in assembly line according to PFMEA and specification during DAP, delivery release and final acceptance of equipment.
• Carrying out internal ran at rate, Customer run at rate, PPAP to demonstrate the line capacity and Support to plant team during SOP and ramp-up.
• Responsible to make the customer capacity sheets.
• Maintaining the Bill of material, rate routing into SAP and maintaining change management through into plant.
• Responsible to create line documentation for work instruction, process parameters, Poka-yoke preparation for product line.
• Responsible to carry out process capability of processes of new assembly line
• Designing and Implementation of the storage system & Material handling system for Raw material, Line storage & FG storage by considering the two- Bin, Kanban, JIT, ergonomics system.
• Drive continuous improvement activities in quality, cycle times, process improvement, machine availability through lean techniques and value engineering to enhance the capability of