Setting Out of Buildings Structures By Using Appropriate Surveying Equipment
use of Appropriate Surveying Equipment for the Construction Activities
(alignment and Leveling Purpose)
interpretation of Working Drawing and Providing Appropriate Information to Supervisory Staff
on Site Tests for Quality Control Purpose
use of Test Reports and Taking Corrective Measures
checking Technical Design and Drawing to Ensure that They are Followed Correctly.
site Supervision:
planning and Monitoring Day to Day Activities to Achieve Daily/weekly Construction Targets.
liaising with Foreman, Supervisors and Providing Necessary Site Information.
monitoring Safety and Health Plan At Site Level
providing Technical Advice and Solving Problem On Site
liaising with Clients, Sub-contractors and other Professional Staff, Especially Quantity Surveyors and the Overall Project Manager
maintaining Site Records and Relevant Site Log Book.
preparation of Daily Progress Reports and Submitting to Appropriate Authorities
monitoring Site Progress By Using Bar Charts.
raising Inspections for all Works. (itr)
utility and Infrastructure Responsibility:
storm Water Excavation.
road Crossing Duct Excavation and Pipe Laying.
gully Excavation and Manhole Setting Pipe Laying.
backfilling.
mv /lv /water Lines Production.
execute and Implement the Schedules and Drawings Issued By Engineer.
quantities, Sizes, Shapes of Reinforcing Rods from Blueprints, Sketches. the Position and Secure Steel Bars, Rods, Cables or Mesh in Concrete Forms.
shapes, Types of Bending as per Bar Bending Schedule.
organizing and Scheduling Works for Foremen's and Labors.
cl, , Manholes in Pipes and Gully Level At Height.
manholes, Trust Block, Chamber all the Reinforcement Details Making.
Experience
3 - 9 Years
No. of Openings
28
Education
Advanced/Higher Diploma, Professional Degree, B.Sc, B.E, M.Sc, M.Tech
Role
Service Technician
Industry Type
Oil / Gas / Petroleum / Solar / Power & Energy
Gender
[ Male / Female ]
Type of Job
Full Time
Work Location Type
Work from Office