Check the quality of all materials received on site.
Check the stacking and storage of materials in various Godowns and stores of the site systematically.
Check the wastage of material at the site.
Checking of work and reporting it to the Project Engineer.
Before the commencement of a new activity, the Quality Control Engineer should issue . C. to ensure preliminary preparations of the different stages of the work-related activities as per format.
Layout
Strata
Masonry
Plastering
Painting
Waterproofing
Plumbing
Development
Checking safety measures
Observation of defects in materials received on site.
Check buildings that are complete and ready for possession.
Find solutions to practical problems faced during the execution of work, for maintaining optimum quality.
Collect various suggestions from site engineers, analyze them and decide on the best alternative solutions, and set up new quality control methods after discussion with the Directors.
Implementation of advanced construction techniques.
This job is located in Gachibowli, Hyderabad.