• Re-commissioning Site, have to Check the all Instrumentation Devices and I/O Ports, Status and Cabling Connectivity of the ATG, EPS, KMS, and DUs.
• Connectivity from the Dispensers to SSC.
• Configuration of SSC and COPT and ATG and EPS System
• Configuration of Instrumentation & Automation devices.
• If found any Hardware and Device Problems, inform to Team Leader then as per his Guideline need to Replace or Repaired it.
• All the cables are must Connect Properly with Lugs and it should be fixed in good manner by using cable ties with Proper Cable Dressing.
• Installation CCTV with Cable laying and DVR Configuration
• AFS Activities for Instrumentation , Automation , Scada & PLC
• MCT Terminal for CCTV, Access Control, Maintenance.
Experience
0 - 1 Years
No. of Openings
15
Education
Diploma
Role
Electronics Engineer
Industry Type
Telecom / ISP
Gender
Male
Job Country
India
Type of Job
Full Time
Work Location Type
Work from Office