- Actual Vs. Documentation
o RM /PM Sampling, Testing and Releasing in ERP.
o ERP entry for FG testing. All Entry of FG Receiving in ERP.
o Retain Sample Management with Records.
o Stability Management with testing and update records as per Schedule.
o Instrument Calibration as per Schedule with Records.
o All Volumetric Solution Preparation and Standardize as per Schedule with Records.
o All Chemical and Indicators Solution preparation with Records. All Chemical Stock Management.
o Give Training of all new Employee related testing, reporting and releasing with properly.
o Coal Sampling, testing and releasing (Moisture, GCV and Ash).
o Documents review of all stage RM/PM/FG/Stability.
o Calibration of Instruments on daily basis which is required.
o All Entry of Log Book along with test and Instruments. All in process stage results mention in ERP and releasing.
o Chemical and Physical test of FG with protocol.
o All Consumption of Chemical with testing, labeling and Preparation.
o Housekeeping of QC in all area.
o Proper Cleaning of Instrument on daily basis.
o Shift Reports preparation and send by mail on daily basis.
o Water Trend Analysis. Water Soluble Substance/Ether Soluble Substance and Ash (2 Batches).