Process Objectives:
provide a Monitoring Framework in Order to Manage the Performance of the Project Design Function
step By Step Design Development for the Project
effective Drawings Control and Co Ordination System
key Sub Processes:
obtaining/creating Drawings
this Sub Process Defines the Procedure for Creating and Obtaining the Approved Layout and Building Plan of the Project. It Involves Architectural as Well as Structural and Services Drawings Also. It Starts from Obtaining Preliminary Drawings from Consultants and Ends At Obtaining Finalized Working Drawings . Architectural, Structural and Service Drawings. It Involves Obtaining Preliminary Drawings, Finalizing the Preliminary Drawings, Getting Municipal Approvals, Obtaining all the Working Drawings.
issuing Drawings
this Sub Process Defines the Procedure for Issuing Gfc (good for Construction) Drawings to Project Sites, Sales Department and Marketing Department.
drawings Coordination and Control
this Sub Process Describes the Procedure to Control the Revisions or Changes in the Working Drawings. It also Involves the Architect and Consultants Site Inspection.
key Responsibilities:
1. cross Check and Approve all Gfcs Before Issuing the Same to Site for Execution/construction.
2. fulfil all Compliances Required By Local Sanctioning Body Till Completion Certificate is Received/ or as Mentioned in Development Control Rules and Regulation.
3. to Visit Site and Cross Check if the Work is Called Out as per the Gfcs Issued.
4. prepare Sales Inventory as per Sanctioned Plans Only. . Sanctioned Number of Flats with Carpet Area and Loading of Common Area. While Issuing Sales Inventory to Sales Dept., It Should Thoroughly Checked as per Sanctioned Plans.
5. to Incorporate all Amenities in Gfcs as Shown in Sales Presentation Plan.
6. to Save all Gfcs in Companys Data Bade/ Record/ File Storage Software.
7. to Make Sure, all the Rules and Regulations are Followed and No Illegal Constr